top of page

Currently under construction and sure to become one of the iconic mass timber structures in this part of the world.
Offsite Design is engaged by the main contractor to help with mass timber sequence and methodology issueing sub-assembly drawings for the LVL diagrid facade structure.
Shop and assembly drawings featuring integrated QA checklists and key plans make for traceability from the mass timber factory to site until all mass timber components are installed.
Builder: Naylor Love Construction
Mass Timber Installer: Kobe Construction
Architect: RTA Studio
Engineer: Dunning Thornton
Prefabricators:
Red Stag Timberlab
Kobe Construction






PHOTO CREDITS:
RTA Studio
bottom of page