Offsite Design federated all design documentation working through producibility and buildability challenges, following our DigiBuild™ methodology. This included developing a modular approach to construction, identifying a viable module, including designing a jig for module assembly. 


Careful coordination with fabricator and mass timber installer ensured efficient manufacture off-site and assembly on site.

Main Contractor: Hawkins

Mass Timber Installer: KOBE Construction

Architect: Jasmax

Engineer: Beca

Prefabricator: Red Stag Timberlab

“The Mass Timber roof was the ‘architectural hero’ of this project”