top of page

Offsite Design federated all design documentation working through producibility and buildability challenges, following our DigiBuild™ methodology. This included developing a modular approach to construction, identifying a viable module, including designing a jig for module assembly.
Careful coordination with fabricator and mass timber installer ensured efficient manufacture off-site and assembly on site.
Main Contractor: Hawkins
Mass Timber Installer: KOBE Construction
Architect: Jasmax
Engineer: Beca
Prefabricator: Red Stag Timberlab
“The Mass Timber roof was the ‘architectural hero’ of this project”







PHOTO CREDITS:
Beca
bottom of page